Time: 2024
Location: Hami, Xinjiang
Scenario: Wind farm in a high-wind and high-sand environment
The grid simulator delivered by Hopewind is utilized for the grid connection performance test for the WTGS on a wind farm in Yandun, Hami, Xinjiang. Throughout the testing process, the grid connection reliability and safety of the onsite WTGS are thoroughly verified, ensuring that it can operate stably after being connected to the grid and meet relevant standards and requirements.