Time: 2023
Location: Baicheng, Jilin
Scenario: Special operating conditions, Low-temperature environment
Through adjusting the output voltage control parameters and other technical means, the grid simulator delivered by Hopewind meets the test requirements for a wind turbine generator system (WTGS) working voltage of 620V and is quickly, stably, and accurately connected to the front end of the WTGS, facilitating the grid adaptability and grid voltage fault ride through tests.

Business E-mail:
Globalsupport@hopewind.com
Service E-mail:
Globalservice@hopewind.com
CopyRight © 2022 Shenzhen Hopewind Electric Co., Ltd. All Rights Reserved. 粤ICP备2020110010号
Français