Time: 2021
Location: Zhangjiakou, Hebei
Scenario: Two simulators connected in parallel
The two multifunctional grid simulators delivered by Hopewind to China Electric Power Research Institute are connected in parallel and utilized for the grid adaptability test, high and low voltage ride through tests, and continuous FRT test for the WTGS at a wind farm in Zhangbei County, Hebei Province.

Business E-mail:
Globalsupport@hopewind.com
Service E-mail:
Globalservice@hopewind.com
CopyRight © 2022 Shenzhen Hopewind Electric Co., Ltd. All Rights Reserved. 粤ICP备2020110010号
Français