Time: 2024
Location: Baicheng, Jilin
Scenario: Wind farm
The multifunctional grid simulator delivered by Hopewind. is utilized on the on-site WTGS for the grid adaptability test, high and low voltage ride through tests, and continuous FRT tes t at a wind farm in Tongyu County, Baicheng, Jilin Province, verifying the grid connection reliability of the on-site WTGS.