Guangdong Foshan Yiguang Aluminum 4.9MW Photovoltaic Project
2025-07-30
Time: December 2024;

Location: Foshan, Guangdong;


The Guangdong Foshan Yiguang Aluminum 4.9MW photovoltaic project was successfully connected to the grid in December 2024. The project utilizes Hopewind 70kW and 110kW string inverters.


需要裁剪-佛山意广-(1).jpg


需要裁剪-佛山意广-(2).jpg