Time: 2020
Location: Bucyrus, U.S.
The Bucyrus 395 Electric Shovel Renovation Project in the United States adopts Hopewind HD2000 Series Air-cooled AFE Frequency Conversion System. Its high-strength seismic design makes the equipment run stably even after withstanding the harsh environments, such as strong vibration, etc., thus effectively extending its service life. The project was officially put into operation in April 2020, with good conditions of site operation. It meets the customer’s expectations and is highly recognized.