Time: 2022.
Location: The sea area outside of Pingtan, Fuzhou, Fujian.
The total installed capacity of the Fujian Changle offshore wind farm area C project is 200MW. It uses 20 wind turbines, all of which are equipped with Hopewind's 3300V/10MW medium-voltage full-power converter. On September 4, 2021, as the first 10MW wind turbine was successfully installed, it indicated that the investment and construction of the first domestic wind power project on a large scale to adopt domestic medium-voltage wind power converters will enter a new stage. At present, the project has been completed and connected to the grid. Hopewind's medium-voltage wind power converter, with characteristics such as high stability and high availability, helps the development of local clean energy and the realization of the "dual carbon" goal.