Time: December 2023.
Address: Hami, Xinjiang.
The project uses 154 Hopewind 6.7MW water-cooled doubly-fed series converters and was connected to the grid in December 2023. Hopewind's converter products have been recognized by customers for their characteristics such as high power generation efficiency, stable performance, and grid friendliness.