Time: 2015.
Location: Qiqihar, Heilongjiang.
Reasons for renovation: The original converter single board has a high failure rate, frequently false alarms, poor grid adaptability, expensive spare parts procurement costs and high maintenance costs. Therefore, it is replaced by domestic alternatives.
Renovation scheme: Use Hopewind HW3000 power module for replacement and replace the core control components.
Renovation effect: After replacement, the converter meets the high and low voltage ride-through functions, and the on-site operation is stable and reliable.