Time: October 2022.
Location: Dongying Port, Shandong.
The total installed capacity of the Bozhong Offshore Wind Power Site A project is 501MW. It uses 60 wind turbine units of China Haizhuang. All are equipped with Hopewind's three-level full-power wind power converter. The three-level technology meets the needs of grid parity and has a series of advantages and characteristics such as "high reliability, high efficiency, and high power density", helping the wind farm reduce costs and increase efficiency. This project is the first batch of grid-parity offshore wind power projects in China and the first one in Shandong Province, realizing a leapfrog breakthrough in China's offshore wind power. The project was connected to the grid in the first batch at the end of October 2022.