Centralized

2020.06.30

100MW Fishery&PV Complementary project

  This 100MW fishery&PV project adopts 1500V/3.125MW 35kV integration solution. and all the components are

on the water surface, the module arrangement is flat, the light is even, and the parallel mismatch of the modules is less. the HPHV3125 inverter with two MPPTs and it ensures the high ROI for customers.


29-澧县李家门渔光互补100MW光伏发电项目-内容图.jpg

share to